October 2019

In October 2019, a contract was signed for the delivery of the Radiation Monitoring System for the ELI Beamlines laser center in Dolni Brezany, Czech Republic

MORE

October 2019

In October 2019, a contract for the supply radiation monitoring equipment to the Bangladesh Atomic Energy Commission was signed

MORE

Radiation monitoring equipment for the Bangladesh Atomic Energy Commission.
October 2019

VF has signed a contract for delivery of contamination monitors to the National Nuclear Research Center in Swierk, Poland

MORE

September 2019

Sports enthusiasts from VF on in-line skates were challenging each other's strength on the 8000 m track.

MORE

VF 8000-IN-LINE
September 2019

Conclusion of the contract for delivery of automatic dosimeters dispensers for the Leningrad NPP

MORE

August 2019

Another of the many events of the VF sport team was the cycling race Climber 2019. The race took place on 28.9.2019 gathering 27 competitors from VF employees. 

 

MORE

Climber 2019
July 2019

VF in cooperation with HI-Q (VF distributor and partner for the USA) participated in the Radiological Effluents and Environmental Workshop (REEW), held in Orlando, FL, USA.

 

MORE

July 2019

VF has signed a contract for replacement of 52 pcs of safety modules RM-2300 in NPP Temelin with our significant partner, the company ČEZ. The system is designed for operational and accident radiation monitoring.

MORE

Safety modules replacement for the Temelin NPP
June 2019

The company VF has successfully completed the production of WAM-303 for the Tianwan NPP.

MORE

June 2019

At the end of July in Czech city Cerna Hora there was held the II International Conference on Radiation Protection organised by the Polish Association of Radiation Supervision Inspectors (SIOR).

MORE

II. International Conference on Radiation Protection SIOR
June 2019

In June 18 to 21, 2019, under IAEA protection in Vienna was organised the International Symposium on Standards, Applications and Quality Assurance in Medical Radiation Dosimetry (IDOS 2019).

MORE

June 2019

In June, we carried out transportation of the facility FRM-03 aimed for waste free release on the Chernobyl NPP.

MORE

Free Release Monitor FRM-03 Delivery for Chernobyl NPP
June 2019

Please be informed that since 1. 5. 2019 the company VF, a.s. switched to the new website www.vfnuclear.com.

MORE

;
  • 60+
  • products for
    nuclear power plants
  • 4
  • different type
    of gamma irradiators
  • 3500+
  • annual distribution
    of contamination monitors
+420 516 428 611
The Czech Republic
Svitavska 588, 679 21 Cerna Hora


Certifications and authorisations